Why Move Your Transformer to the Factory
When we Bring the Factory to Your Site.
When a transformer have a defect which require Un-tanking to repair the active part then the transformer need to be moved to a workshop, moving the transformer to the workshop consumes time, cost and involves high risk/challenge during transportation.
Our Site Repair Shop is a tailor made sealed enclosure pressurized with filtered dry air to provide safe environment to the active part by avoiding moisture ingress, pollution by alien particles and prevent damages from rain, hailstone, sand and snow. We can replace defective winding coils, repair OLTC, On-site drying process, and On-site High voltage testing.